Entering text into the input field will update the search result below

Kibali mine operating at design, Randgold CEO says

Jan. 27, 2015 2:54 PM ETBarrick Gold Corporation (GOLD) Stock, ABX:CA StockGOLD, AUBy: Carl Surran, SA News Editor
  • Randgold Resources (GOLD +2.3%) CEO Mark Bristow says the Kibali gold mine in Zaire is now well advanced into the second and final phase which will take it to full production by 2018.
  • With the final commissioning of the metallurgical plant and the first of three hydropower plants, Kibali is operating at design with the ramp-up having delivered against plan, the CEO says.
  • GOLD is developing and operating the mine, which it owns in partnership with AngloGold Ashanti (AU +5.9%) and a Congolese state-run firm.

Recommended For You

More Trending News

Related Stocks

SymbolLast Price% Chg
GOLD
--
ABX:CA
--