Fortis Inc. (FTS) CEO David Hutchens on Q1 2021 Results - Earnings Call Transcript

Fortis Inc. (NYSE:FTS) Q1 2021 Earnings Conference Call May 5, 2021 8:30 AM ET
Company Participants
David Hutchens - President, Chief Executive Officer
Jocelyn Perry - Executive VP, Chief Financial Officer
Linda Apsey - President & Chief Executive Officer, ITC Holdings Corp.
Charles Freni - President & Chief Executive Officer of Central Hudson
Stephanie Amaimo - VP, Investor Relations
Roger Dall'Antonia - President and CEO of FortisBC
Janine Sullivan - President and CEO of Fortis Alberta
Conference Call Participants
Maurice Choy - RBC Capital Markets
Linda Ezergailis - TD Securities
Rob Hope - Scotiabank
Mark Jarvi - CIBC Capital Markets
Michael Sullivan - Wolfe Research
Andrew Kuske - Credit Suisse
Elias Foscolos - IA Capital
Patrick Kenny - National Bank
Operator
Ladies and gentlemen, thank you for standing by. My name is Debba and I will be your conference operator today. Welcome to the Fortis Q1 2021 Conference Call and Webcast. During this call, all participants will be in a listen-only mode. There will be a question-and-answer session following the presentation. [Operator Instructions]
At this time, I would like to turn the conference over to Stephanie Amaimo. Please go ahead, Ms. Amaimo.
Stephanie Amaimo
Thanks, Debba and good morning everyone, and welcome to Fortis' first quarter 2021 results conference call. I am joined by David Hutchens, President and CEO; Jocelyn Perry, Executive VP and CFO; other members of the senior management team, as well as CEOs from certain subsidiaries.
Before we begin today's call, I want to remind you that the discussion will include forward-looking information, which is subject to the cautionary statement contained in the supporting slide show. Actual results can differ materially from the forecast projections included in the forward-looking information presented today.
All non-GAAP financial measures referenced in our prepared remarks are reconciled to the related U.S. GAAP financial measures in our first quarter 2021 MD&A. Also, unless otherwise specified, all financial information reference is in Canadian dollars.
With that, I will turn the call over to David.
David Hutchens
Thank you, and good morning, everyone. Today we are pleased to report a strong first quarter. On the financial front, EPS growth was supported by our record capital investments made in 2020 and during the first quarter of this year. Higher earnings in Arizona also contributed to year-over-year earnings growth.
On the operations front, our systems continued to perform well with our people focused on delivering safe and reliable service. As a good example of this, in Arizona, our gas and electric utilities maintained reliable service to our customers throughout winter storm Uri that affected so many other surrounding states. It serves as a reminder to planning for the long-term and preserving adequate capacity is critical to the provision of energy service to our customers under an increasingly wide range of circumstances.
On the ESG front, we continue to advance key initiatives. As you may have read in our circular, we have ten current directors and two nominees up for election. Assuming all nominees are elected in our Annual Meeting tomorrow, the Fortis Board will have reached gender parity for the first time in our history. This is a significant milestone in our diversity and inclusion journey.
We are also strengthening our compensation metrics with the addition of new ESG-related measures. The metrics are focused on carbon reduction and climate change, building on our corporate-wide target to reduce carbon emissions 75% by 2035.
Additionally, we are happy to report that our credit ratings were affirmed by S&P in April and our outlook was revised to stable from negative. And yesterday, DBRS Morningstar upgraded our credit rating from BBB high to A low. These positive developments underscore our financial strength.
Lastly, in April, FERC issued a supplemental notice of proposed rulemaking on incentives. Effectively FERC is proposing to eliminate the 50 basis point Regional Transmission Organization or RTO ROE adder for utilities that have been RTO members for more than three years. Not only were we surprised in the reversal of FERC’s direction on the RTO adder, but we are extremely disappointed given the important role RTOs play in facilitating the reliable cost-effective and resilient grid, while enabling clean energy goals.
Turning to Slide 5, through the first quarter, $900 million of capital was invested in our utilities to support resiliency, modernization and cleaner energy projects. For 2021, our $3.8 billion capital plan remains on track. Higher forecasted capital expenditures are expected to offset a lower foreign exchange rate. Recently, we completed the Oso Grande wind project at Tucson Electric Power.
The 250 megawatt project is the company’s largest renewable energy resource with enough power to energize nearly 100,000 homes. The project complements TEP’s integrated resource plan, which calls to exit coal and add 2400 megawatts of new wind and solar power and 1400 megawatts of energy storage by 2035.
And in Ontario, the Wataynikaneyap Transmission Power Project continues to progress. The 1800 kilometer transmission project is the largest first nation’s majority owned infrastructure project in Canada’s history. With this ownership structure, the project is a model for indigenous communities across Canada. Fortis brings a 39% equity interest and achieve through the expertise’s project manager to the partnership.
At the end of the first quarter, 850 transmission towers has been installed with approximately 1100 workers on site including First Nation’s members. The project is on track to be completed in 2023. By replacing diesel fuel generation with cleaner energy from the Ontario grid, the Wataynikaneyap project is estimated to reduce emissions by 6.6 million tons over a 40 year timeframe.
Additionally, the project is expected to generate significant benefits for First Nation’s communities, including access to reliable energy supply and economic benefits from construction. We are very thankful for the partnership with First Nation’s communities as we work together to realize their vision, while advancing the project during the pandemic.
As Slide 6 highlights, we expect to invest $19.6 billion in our systems through 2025 with nearly all of our capital supporting energy delivery and the transition to a cleaner energy future, we have a balanced low risk plan. Investments including renewable generation such as, wind, solar and battery storage, interconnections of renewable, liquefied natural gas and renewable natural gas continue to support our sustainability strategy.
The capital plan is expected is to increase rate base by $10 billion from $30.5 billion in 2020 to over $40 billion in 2025 supporting average annual rate base growth of approximately 6% through 2025. Beyond the base capital plan we are focused on incremental opportunities that expand and extend the growth. First at ITC, the Mid-Continent Independent System Operator or MISO has initiated a long-range transmission planning process.
In March, MISO outlined conceptual maps identifying potential new transmission required to enable more renewable generation in the region. Specific details regarding the size and location of MISO long-range transmission projects remain unknown until the studies are completed, but as Slide 7 highlights, ITC’s assets are strategically located to interconnect the Midwest to cleaner energy resources.
Also at ITC, the proposed Lake Erie Connector Transmission project continues to progress. In April, the Canada Infrastructure Bank announced that it will fund up to 40% of the project cost. ITC will own the transmission line and be responsible for all aspects of design, engineering, construction, operations and maintenance.
The project is expected to bring an estimated $100 million in annual savings to Ontario customers by connecting their grid to the PJM connect – interconnection, the largest electricity market in North America.
Additionally, the project is expected to reduce greenhouse gases by up to 3 million tons per year. While the project is fully permitted and shovel ready, it is not included in the current five-year plan as we continue to negotiate transmission service agreements. Once finalized, construction of the projects would take four years to complete.
In Arizona, the team is working to advance its clean energy goals, which requires investments in the range of $4 billion to $6 billion to execute Tucson Electric Power’s integrated resource plan. And in British Columbia, we continue to pursue further development of the Tilbury site, long-term contracted LNG opportunities and additional investments required to attain Fortis BC’s target to reduce customer greenhouse gas emissions 30% by 2030.
Lastly, the Biden administration recently released its proposed infrastructure plan calling for carbon-free power from the electricity sector by 2035. This could accelerate capital investments at our U.S. utilities through transmission interconnections at ITC, clean generation and energy storage in Arizona, and electric vehicle infrastructure in the nine U.S. states that we serve today.
With a strong track record of increasing dividends for the 47 consecutive years, coupled with our low-risk growth strategy, we remain confident in our 6% average annual dividend growth guidance through 2025.
Now I will turn the call over to Jocelyn for an update on our first quarter financial results.
Jocelyn Perry
Thank you, David, and good morning everyone. For the quarter, adjusted net earnings was $360 million or $0.77 per common share, $0.09 higher than the first quarter of 2020. As David mentioned, increased rate base at our regulated utilities and higher earnings in Arizona were the main growth drivers for the quarter.
Slide 12 highlights EPS drivers for the quarter by segment. Our U.S. electric and gas utilities provided the most significant contribution growing EPS by $0.05 for the quarter, compared to the same period last year. Our Arizona business contributed a $0.04 EPS increase. This was driven by new rates at Tucson Electric Power effective January 1, offset by higher operating cost associated with planned generation maintenance.
Additionally, the $0.02 impact of losses on retirement investments recognized in March of 2020 favorably impacted the quarter-over-quarter change.
In New York, Central Hudson increased EPS by $0.01, driven mainly by rate base growth and timing of operating cost. And a $0.02 EPS increase for both ITC and our Western Canadian utilities was mainly due to rate base growth.
Our Energy Infrastructure segment contributed a $0.01 EPS increase, driven by production at the Belize Hydroelectric Generating facilities. And in our Corporate and Other segments, the $0.01 EPS increase mainly reflects losses on foreign exchange contracts that were recognized in the first quarter of last year. This increase was tempered by higher weighted average shares outstanding issues or a dividend reinvestment program.
And lastly, a lower U.S. dollar to Canadian dollar exchange rate unfavorably impacted quarterly results by $0.02. All in all, a very strong quarter with minimum financial impacts from the pandemic.
Turning now to an update on our credit ratings and liquidity. Earlier this year, we highlighted the significant improvements in our cash flow to debt and holding company debt ratios over the past couple of years. Throughout the pandemic, we have maintained a strong credit profile as our utilities have managed cost and regulatory mechanisms that serve to stabilize cash flows and earnings have operated as expected.
As David mentioned, in April S&P affirmed A minus issuer credit rating and our BBB+ on secured debt rating and also revised our outlook to stable from negative. And just yesterday, DBRS Morningstar upgraded our corporate and unsecured debt ratings from BBB high to A low. Both rating agencies highlighted our improved credit profile and operational and financial stability throughout the pandemic.
Overall, our credit metrics coupled with Fortis’ low business risk profile positions us well within our existing investment-grade credit ratings. And finally, we continue to maintain strong liquidity with over $4 billion available on our credit facilities.
Now turning to Slide 14 for an update on our ongoing regulatory proceedings. At ITC, FERC issued a supplemental notice the proposed rulemaking related only to the incentive adder for participation in the RTO. Notably, the commission modified the initial NOPR from 2020, which proposed to increase the RTO adder to 100 basis points.
However, the supplemental NOPR now seeks to eliminate the 50 basis point RTO adder for transmission owners that have been a part of the RTO for more than three years, including ITC.
As David highlighted, we were disappointed with FERC’s proposal given the current public policy goals to encourage investment in transmission to enhance grid reliability and transition to a cleaner energy future. We believe the utility participation in an RTO provides customers with benefits that far outlay the costs. ITC is reviewing the supplemental NOPR and will be providing comments, which are due to FERC later this month.
There is no stipulated timeframe for FERC to issue a final rule and any impact would be prospective. As a reminder, every ten basis points change in ROE at ITC impacts Fortis’ annual EPS by approximately $0.01.
In New York, government discussions are ongoing in Central Hudson’s general rate application and we do expect that a decision later this year. Earlier this year, the British Columbia Utilities Commission initiated a generic cost of capital proceeding for all regulated utilities in BC including our gas and electric businesses.
The proceeding is expected to set cost of capital parameters effective January 1, 2022. In March, Fortis Alberta received a decision on the 2022 generic cost of capital proceeding. Current cost of capital parameters remain in place for 2022.
And lastly, in conjunction with the expiration of Fortis Alberta, the current performance-based rate making or PBR term ending in 2022, the AUC has initiated a post as to gather stakeholder feedback on how a cost of service rebasing can be completed to establish base rates after 2022. Concurrently, the AUC is evaluating the effectiveness of past and current PBR plans to determine whether a third PBR term should be established. Reports on the findings are expected in mid-2021.
Before wrapping up my remarks, I would like to discuss the potential implications of the recently proposed tax changes and infrastructure spending. From a U.S. tax perspective, the proposed increase in the corporate tax from 21% to 28%, if passed, is expected to increase earnings and cash flow as it will have some of the reverse effects of the 2017 U.S. tax reform.
The Made in America tax plan also includes proposals to introduce transmission investment tax credits. This is expected to encourage large regional projects, while the newly proposed Department of Energy Grid Development Authority should streamline permitting and planning of regional and intra-regional transmission investments.
While not depicted on this Slide, the Made in America tax plan also introduces a minimum tax on book income, which could impact timing of cash flows, as well as changes to international taxation. The federal – the Canadian Federal government also released its budget last month including proposed changes to interest deductibility, which could also impact timing of cash flows and changes in international taxation.
Draft legislation in both countries has not yet been released. We will continue to assess and we’ll provide further information as more details become available.
With respect to infrastructure spending, while we recognize the America job plan requires final approval, we are pleased to see a strong focus on the critical role transmission place in facilitating new renewable generation and grid resiliency. This emphasis on investments in clean energy aligns with Fortis’ focus on improving our low carbon footprint and our goal to deliver a cleaner energy future.
That concludes my remarks and I’ll now turn the call back to David.
David Hutchens
Thank you, Jocelyn. In summary, we remain steadfast in providing safe and reliable service with the safety of our employees and customers top of the mind. We have a strong five year growth outlook, supporting our 6% average annual dividend growth guidance through 2025. And as we look forward, we are optimistic about the growth prospects in our business including the heightened focus on the clean energy transition across North America.
I will now turn the call back over to Stephanie.
Stephanie Amaimo
Thank you, David. This concludes the presentation. At the time, we’d like to open the call to address questions from the investment community.
Question-and-Answer Session
Operator
Thank you. [Operator Instructions] Your first question comes from the line of Maurice Choy with RBC Capital Markets. Please proceed with your question.
Maurice Choy
Thank you and good morning. My first question relates to the FERC NOPR. Recognizing the RTO adder was obviously the main topic of the supplement to NOPR, but can you discuss the potential upside to ROE from other matters in the March 2020 NOPR such as the cost benefits, reliability, and also how do you see disposition in April impacting the Transco Independent’s adder?
David Hutchens
Yes. Thanks, Maurice and good morning. Glad you could make it on the call today. Yes, as you know, the March 2020 incentive NOPR, they came out had a several different categories that it actually – as you mentioned on the RTO adder side of things, it actually was increasing that 50 basis point current adder to $100 part of that original proposal, which is why we are so surprised that switch is going from 50 to 100 and then to zero.
But it also included another 100 basis points from reliability projects, 100 basis points for new technology and an another 50 basis point for projects that improved efficiency or reduce costs. So, overall, there was 350 basis points of additional incentive opportunities there on a project-by-project basis although within that NOPR at this cap, the total of any one project at 250 basis points.
So, we obviously are very strong performance of looking at ways to incentivize new transmission on a going forward basis. Again surprised that that is RTO reduction, but frankly, that it’s early days and it is just a NOPR. Basically, we have the original NOPR and the supplemental NOPR and the NOPR is sitting here at basically a bit ask spread of zero and a 100.
So, we don’t know where that will end up and we will obviously make comments accordingly on the importance of the RTO adder for trends – for basically for getting people inside those RTOs. It is extremely important to recognize that the bigger the markets are the lower the costs are, the higher the reliability and the more renewable energy that we can integrate into the system. So, we really think that that was the wrong direction to send.
On the independent’s adder, we’ve been fighting those for a while and I don’t think this provides us any additional insight on where that might go.
Maurice Choy
Okay. Then, and maybe related to that my second question, your outlook comments noted that there were all of the further expansion in terms of electric transmission grid in the U.S. and that visibility on initial projects could be as early as this year. Can you elaborate a little bit more about this visibility, where do you see this growth coming from and also timing in terms of how potential projects could fall within – or just look at a five year plan?
David Hutchens
Yes. I will turn this over to Linda Apsey, the CEO of ITC here in a second. Just a real high level, MISO is in that planning process and they’ve put out a – there is a ton of grade information on their website related to the – these – basically these three different futures that they are analyzing that will have different percentages of renewable integration, as well as different growth scenarios. I would point out though that when you look at those futures, even the most aggressive one might seem a little bit staled these days as we have cranked up our level of greenhouse gas reductions in the United States at least for targets that we are putting out from the Biden administration. So, even that might be – I would say – I wouldn’t say conservative, but might not be as aggressive as what we might see over the next years, because it is that – that 20 year outlook. I would suggest that there might be the need for a future for to see if we actually followed the Biden energy plan and have those – that 50% - 50% to 52% greenhouse gas reductions by 2030 and what that would look like. But I’ll turn it over to Linda, so that she can tell us about the timeframe and expectations there.
Linda Apsey
Great. Thanks, Dave and good morning, Maurice. Yes, as Dave mentioned, I would characterize MISO as perhaps the most advanced in their long-range planning efforts and as Dave, I think outlined in terms of the different futures, the different scenarios, we are expecting MISO to announce, kind of their, what I would call their basket or portfolio of first mover projects later this year, probably in the October timeframe. And the hope is that, there would be a sort of a set of projects, these first mover projects that would be included in MISO’s – their plan that’s their annual transmission expansion plan that goes to their Board of Directors for approval.
So, if all goes as planned and as indicated, we could anticipate seeing portfolio of projects in the latter part of this year. I would say consistent with that, there is a group of MISO transmission owners that is also advancing principles around cost allocation that would be coincident with the projects that are put forth. I think as we have talked about previously, the biggest sort of hurdles if you will to realizing these retail transmission projects obviously, the planning collaboration, coordination, but certainly also having a cost allocation methodology that can realize the projects that are put forth. So, we are very optimistic given I would say, a lot of the activity, the conversation, the collaboration, the engagements across MISO. And so, certainly, I think as Dave suggested, I think as we move forward, we’ll continue to see MISO refine their future studies based on assumptions around penetration of renewable levels. But, overall, very optimistic on the MISO planning process and meanwhile, FPP, they too are actively engaged and involved in a long-term transmission planning effort, not quite the same visibility at this point in time in terms of timing. But again, I would say, all of this is on a very constructive positive direction.
Maurice Choy
Great. Thank you very much.
Operator
And your next question comes from the line of Linda Ezergailis with TD Securities. Please proceed with your question.
Linda Ezergailis
Thank you. Looking at some of the recent positive actions from some of the debt rating agencies, I am wondering when you expect to next get an update from Moody’s and what sort of changes if any might come on that front?
And I guess, as a follow-up question, I am just wondering, how the debt rating agencies reflect some of the uncertainties around the FERC NOPR? The recently, the Biden infrastructure plan, some of the proposed tax changes in Canada and U.S. is there a few moving parts and I am just wondering how that’s reflected in their base outlook and scenarios?
Jocelyn Perry
Hi Linda, it’s Jocelyn. Yes, with respect to Moody’s next update, I would suspect it will be over the next couple of months. We have recently met with all three rating agencies, DBRS, S&P and Moody’s just to give them an update on our annual 2020 results. So, a lot of those has been going very well and as you could see in this quarter, we have received an upgrade from DBRS and the negative outlook for removed from S&P, which we were pleased about. Our conversations with Moody’s were good and I can’t predict the outcome of that, but I am not anticipating much change there, like I said, I think all rating agencies were pleased with the improvements that we’ve made in our balance sheet over the last couple of years. So, we had good discussions.
With respect to how they reflect he NOPR, you’ve probably seen us when the S&P came out with some commentary around the NOPR that suggested that that they would expect the NOPR, if approved, would temper cash flow metrics for Fortis down to the lower end of the range but not drive us down below the range, which is a fair point, if that is the only thing that’s approved in isolation of everything else. So, they recognize that. They are all aware of the NOPR. They are all aware of the Biden infrastructure plans. They are all aware of the tax, but as you say, they are moving pieces and it’s hard to nail down exactly what any of them potentially mean and Fortis have worked through this in the past and I envision we are going to work through all of this going forward. So, no, no real red flags here with the credit rating agencies and we’ll continue to communicate with them and keep them apprised of any development.
Linda Ezergailis
Thank you. And as a follow-up, with respect to some of these additional potential opportunities, Tilbury, Lake Erie Connector, et cetera, if they were to reach a positive FID this year, what are the thoughts on how they might be optimally financed? For the Tilbury, just generally adding, like additive to your already pretty robust rate base growth outlook. Just wondering where the incremental capital might come from?
Jocelyn Perry
Yes, no, sorry, Linda, yes, no, you are right. We’ve also stated that we look at our $19.6 billion capital plan, we were expecting that the drift will be a little bit of a lower participation. But as you know, participation back up to, I would say, pre-2019 levels go back up to that 35% participation. So we’ll have some extra capacity under our grid. But I’ve always said that, if we are in a position where we are growing even faster than that, then, I’d say to this David all the time, everything goes back on the table from a funding perspective. But right now, we do have some current flexibility with those grid programs giving us extra above them what we thought at least at that $19.6 billion plan.
Linda Ezergailis
Thank you. And just a question around your cash flows from operations. I noticed that your accounts receivable is creeping up a little bit recognizing that there has been some relief provided to customers during the pandemic. What the outlook in the trend for whether that might continue to grow through the year? Whether that might be recovered through regulatory mechanisms over time? Or potentially stays flat for a while? How might we think of that trending?
Jocelyn Perry
Linda, that’s a great question. And last year, certainly, with the start of the pandemic, it was an area that a lot of companies focused on no doubt including Fortis, we did see an increase in receivables last year. I do feel like we’ve – it’s hard to predict entirely, but I do feel that we are in a good place right now. We adjusted our reserves to reflect the fact that our receivables were increasing. We obviously see the plateau and that we are in a good spot. We are not seeing it worsen, which I think is very – a very good point. Clearly, we are all looking for this pandemic to be over and to get back to more normal, normal operations and we are not going to take our eye off of this, but I would say that, yes, you are correct, we did see it increase. But we are starting to see it levelize and we are in a good position from how we provided for that in the previous year.
David Hutchens
I would just add to that, that probably the two utilities that are most exposed to that that don’t have the regulatory mechanisms and defined as clearly as others would be UNS and CH and I’d that, as we are coming out of the pandemic here, those are the two of the states that are probably coming out pretty quick here. So, we would expect that positive recovery to obviously impact us in a positive manner from a customer opinion perspective.
Linda Ezergailis
Thank you. I will jump back in the queue.
Operator
And your next question will come from the line of Rob Hope with Scotiabank. Please proceed with your question.
Rob Hope
Great. Yes. Good morning everyone. First question, just on the Lake Erie connector, so ,it looks like the Feds are on board with the project. However, we still need to offtake, which we expect will be driven by the provincial government. Are the Feds talking to the provincial government is the Canadian Infrastructure Bank's kind of actions a precursor to contracts there? Or maybe more broadly, where are we in that project right now?
David Hutchens
Yes. So, we can’t really tell exactly what’s going on behind the scenes, but we are obviously having a lot of conversations with the provincial government in Ontario there related to this project. But having the Federal government involved and having the Canada Infrastructure Bank come out and support of this project, I think is all very positive for us to progress that project. It’s a great project. That’s - I mean, just laying out there that, it’s got a great savings story. It’s got a great greenhouse gas reduction story. It’s got a great reliability story. It is a really, really good project. This is kind of the things that when you think about big transmission projects as interconnect markets that we should be focused on longer term. In fact, this is one of them that’s called out specifically in one of the most recent studies that show all these basically shovel ready projects that are wearing to go. Lake Erie Connector was on that list. So, yes, we think that the positive momentum, the positive conversations among government, whether it’s at the stated provincial or going to do nothing other than help us get this project moving, get TSAs finalized and get the – I was going to say, wires in the air, but it’s actually wire underwater. So, that we are looking forward to starting this project.
Rob Hope
Alright. Thank you. And then, I just want to go back to the NOPR. GLIC was out yesterday saying, is baffled by the criticism of the changes of the NOPR and that you didn't need an incentive to be part of an RTO. However, you also mentioned that if you need to incent transmission, there would be kind of other ways to do it including a higher base ROE. So, could this NOPR change, then kind of once again lead to another fulsome review of the ROE for ITC?
David Hutchens
Yes, Rob, I don’t think – I wouldn’t go that far on the tale under your question there that this basically brings up the base ROE conversation again, but I’ll point out a couple things. First, reading the descents from Danley and Chatterjee, Commissioners Danley and Commission Chatterjee related to this RTO adder removal is very insightful. There is a couple points. One, they obviously argue that the reason for having this RTO adder from a market perspective. We need bigger markets as I mentioned before, that is the solution to integrating renewable, we need bigger markets, we need more participants. The bigger the market, the better cost allocation is, the better reliability is, the more renewable energy we can integrate. That should be the key focus, which is, that leads me to the second point, which is both commissioners Danley and Chatterjee bring up is legally, the Federal Power Act requires that there is an incentive to participate in the RTO and there is 14 years of President that is related to exactly doing that. So, it’s odd that this would be a focus of a supplemental NOPR. And we obviously will make comments that I think will sound a lot like the descents from those two – the two minority commissioners are. So, we – while it is – I understand commissioners - commissioner Glic's opinion that this is a different mechanism than the project incentives. I think our answer is, yes, but you need both. One is for projects, the other is for RTO participation. Those are two very different incentives and you got to make sure you have both, especially given the accelerated renewable energy transition that we are trying to push across the United States under the current Biden administration.
Rob Hope
I appreciate the color. Thank you.
Operator
And your next question comes from the line of Mark Jarvi with CIBC Capital Markets. Please proceed with your question.
Mark Jarvi
Thanks. Good morning, everyone. I just wanted to go to the transition tax credits. I am wondering that, as you gone through the – your understanding of how broadly applicable that might be to things like, they come into fold in terms of Lake Erie project. And then, any idea in terms of loosely quantifying what it could impact be positive EPS from cash flow?
David Hutchens
Yes, so, the question there is around the investment tax credits for transmission projects on a going forward basis, because there is a lot of incentives and a lot of attention being paid on transmission. Obviously, the – when you look at the infrastructure plan and the $100 billion of satisfied basically for grid upgrades to improve both regional and inter-regional transmission, there is loan guarantees, there is obviously structural changes they are making to try to get things permitted more quickly, partnerships between DOE and DOT down here in the U.S., a lot of that stuff. And obviously, tax credits are going to be part of that overall push towards new transmission projects as well. I am going to kick that to Linda to talk a little bit about, but generally what we see from a tax credit perspective, from a transmission perspective is this will hopefully bring some of those projects that might be around the edges into fruition. It might be the thing that put some of these projects over the edge from an economic standpoint. Do you have any additional color on that, Linda?
Linda Apsey
Yes, Dave. Not a whole lot, it is my color, I mean, certainly, we are still awaiting sort of further clarity or insight in terms of specifically how would those projects that may be eligible for the investment tax credit. How would they come to fruition. There is talk about, sort of you can, sort of make some options around kind of taking advantage of the tax benefits. I think the positive news is that, we see all of these things, not only a positive from a tax perspective, but certainly, we do not view them as eroding the rate base of the projects. But more to come. The details, I think are still pretty great at this point in time. But I think overall, and most importantly, I think it’s just all of the positive momentum around incentivizing transmission. Obviously, from our perspective, whether that be true sort of the FERC avenue perspective or whether it be through our tax incentive. So, I think more to come as the, sort of the legislative proposals get more substantive. We’ll be able to share more information on that.
Mark Jarvi
But just based on those comments, it seems like it's based on what ITC is contemplating on what’s in your outlook. It would be a largely more on the fringe as opposed to a lot of your core investments?
Linda Apsey
Yes, that’s correct. I mean, we would envision that the typical, what I would call, regional transmission projects would continue to go through the RTO planning process be included in our rate base. I suppose if there is some projects that meet certain criteria that perhaps legislation specifies and perhaps those could be – they could take advantage of the tax credit, but as we sit here right now, our belief is that most of the sort of what I would call traditional regulated transmission projects will continue to go through the RTO planning process. And that perhaps, there will be sort of other definition or categories of transmission projects that meet certain criteria that maybe eligible for certain tax benefits. So, like I said, all of those details haven’t developed yet, but we are going to have to continue to work with congressional folks, the administration to help kind of flush those details out.
Mark Jarvi
Okay. Got it. And then, Jocelyn, the question is for you. I know you still – you are still looking for lot more details around some of the proposed tax changes here in Canada and the U.S. But if you had to say one versus the other is getting potentially more impactful, is it the U.S. changes on minimum taxes international tax treatment? Or any kind of comments in terms of the relative impact of what you’ve seen so far from those proposals?
Jocelyn Perry
So, Mark, that’s a tough question, because we have limited information, both in the U.S. and in Canada. But when you look at the impacts for Fortis, the increase in taxes is a pretty – is a simpler one, because we are going to likely see partial reversal of what we had seen with U.S. tax reform. So, we will have some increase in taxes, increase in cash flow. When it comes to the – like interest deductibility limits in Canada and the 15% minimum tax in the U.S., both of those are going to be driven by how they define. Tax EBITDA or the minimum book income. So, and we don’t really have clarity on that. Just cash flow on that particular one, but still important, it will be timing of cash flow. But it’s hard for us to say, which is one is really going to be more impactful, because it’s going to depend on the definitions I think.
Mark Jarvi
Okay. And then, just one last question around the NOPR. If it was passed as it's been proposed today, would there be any retroactive adjustments or it would just be solely on a go forward basis in terms of impact on your rates and revenues?
David Hutchens
Yes, it’s solely on a going forward basis.
Mark Jarvi
Okay. Got it. Thank you, Dave.
David Hutchens
You are welcome, Mark.
Operator
And your next question comes from the line of Michael Sullivan with Wolfe Research. Please proceed with your question.
Michael Sullivan
Hey, everyone. Good morning.
David Hutchens
Good morning, Michael.
Michael Sullivan
I first wanted to just on the CapEx plan, you guys noted for the year that, higher CapEx could potentially offset FX headwinds. Where would that be coming from? And how material could that be?
David Hutchens
It’s coming from a couple different places this year. Some has to do with the timing of Oso Grande investments that we have made basically some of that leaked over from 2020 into 2021 in getting that project completed. There is a little bit of additional at the Wataynikaneyap project, as well. And also, Scotia that’s at Fortis Alberta. So, right now, those three pieces are basically covered in that delta between what we had in – what we used to the $19.6 billion of capital budget and this year’s capital budget and what the current rate is.
Michael Sullivan
Gotcha. Okay. And then, kind of similarly, if the NOPR does, I am sorry to beat a dead horse on this,, but if the NOPR were – if simple now NOPR were to go forward as proposed, are there any potential offsets that you guys would have there to – I guess, a nickel or so of downside?
David Hutchens
Yes, I mean, it’s the offset in the growth that we are always looking for. This is really about not just focusing on the ROE, the adders, the incentives, all of that stuff that obviously is extremely important and definitely the topic de jure, that's for sure. But what we have to look at to is longer term, how we are going to be growing that transmission business. And as I mentioned previously, just all of the effort around building up the transmission system, everybody is in alignment on the need for additional transmission infrastructure for us to even – even to have a prayer of becoming to getting close to meeting the clean energy transition targets that we are putting out in the United States. So, it’ really – there is two different topics. That's the return side of things, but the other is, what we call the pie side of things. And this pie is going to be growing enormously. So, we have got to see, basically how those two are going to balance out and as we talked about from a transmission planning process MISO is in the middle of it. SBP is getting after it and a lot of independent transmission investments are going on throughout the United States. We have to take a look at that bigger broader picture, see how that applies to things that we can invest in. And then, put that whole story together. Unfortunately, you are probably jumping into a bit like we are trying to figure out how much of this is out there, but it will take some time for us to figure this out and then, we’ll have a better balance of that growth in return picture on a going forward basis.
Michael Sullivan
Okay. Appreciate the color there. And then, my last question was, at the Lake Erie project, any better sense or clarity on how long the TSAs could take like what’s in the balance of the year reasonable and would you guys get AFUDC on that once it starts construction?
David Hutchens
Yes, I would pine on that, but I don’t want to get in trouble with Linda and putting out the date that she doesn’t agree with. So, I am going to shoot straight to her to answer that one.
Linda Apsey
Yes, thanks, Dave. Certainly, we are hopeful that we can continue to see progress and that we can reach an agreement within the coming months by the end of the year. But certainly, as you can imagine with any type of negotiation in two party negotiation. It takes two of us obviously, come to terms. So, are we hopeful? Is that possible? Absolutely.
And I am sorry. I cannot specifically answer the AFUDC question. I don’t know, maybe perhaps, Jocelyn can.
Jocelyn Perry
Yes, no. That’s all part of, I would say negotiations of the whole project cost and how we finance that. But it’s a non-regulated business as you know, Michael.
Michael Sullivan
Got it. Okay. Thanks so much.
Operator
Your next question comes from the line of Andrew Kuske with Credit Suisse. Please proceed with your question.
Andrew Kuske
Thanks. Good morning. Maybe if you could just focus a little bit on Arizona and obviously, there is some pretty big capital plans there from Intel, TSMC, among others there is just natural happenings in the state, but does those two semi manufacturers vary by capital? It looks like it falls outside of your service territory. But could you – you could maybe give us a little bit of color in context on opportunities you think will happen, just from the capital flows into the state.
David Hutchens
Yes, Andrew, that’s a great question and a lot of times, when you look at some of the economic data in Arizona, it’s obviously driven mostly around the Phoenix area, Maricopa County, which is obviously one of the fastest-growing – if not the fastest growing county in all of the U.S. Some of that does leak out to areas around the Phoenix area down into Arizona. We have seen an increase in economic development inquiries. In Southern Arizona, we have an economic development organization that both me and Susan Gray the new President and CEO of UNS Energy are both part of. So, we are seeing some visibility into that. And we do see that we are going to – and it is Arizona. I mean, this is a strong growth state and will continue to be a strong growth state on a going forward basis. And we obviously are looking to attract as much business as we can. Economic development is the best of all things from a utility standpoint is that’s what brings in customer growth that actually brings in KWH with it. So that when you are investing to add these customers, you are adding the usage to the formula as well and some of these larger customers like the Rosemont mine that’s still sitting out there waiting to get through its legal hurdles and get started. Those big customers like that are beneficial for our overall customer base and our rates because we can spread those cost out among more customers and more kilowatt hours.
Andrew Kuske
That’s helpful context. And then maybe just still staying within the state, do you foresee any opportunities to do renewable generation outside of your existing rate base sector that needs to maybe support corporate customers that are seeking to have cleaner power?
David Hutchens
Yes, we actually just announced this week when we brought the big solar project at NextEra built for us a 100 megawatt project with a 30 megawatt battery and of course also ground that project as well. We actually earmarked some of those kilowatt hours for our University of Arizona, we entered into a long-term contract with them to provide them with a 100% renewable energy, which is one of the biggest – it’s a – this is a biggest deal like that with a public university in the United States. So, we are really proud of that deal. We're always looking at ways to meet our customers’ needs and if there is additional renewable energy that they are looking for and that we can invest in and that we can get a long-term contract that points back to those resources, we are always looking at things like that, always I have been always will be. There is also other utilities within our footprint in our control area, smaller municipalities co-ops et cetera that are always opportunities for that as well. But those are things we look at, not something we have a laser focus on, but always looking to help out our customers and look for investments around the edges even if they are unregulated or we like to call contracted energy infrastructure deals.
Andrew Kuske
Very helpful. Thank you.
Operator
And your next question comes from the line of Elias Foscolos with IA Capital. Please proceed with your question.
Elias Foscolos
Good morning. Just want to focus on the capital plan and potential inflationary pressure that you might see on it. So I was wondering if you could provide some color on that. And just also comment on the ability to absorb any further increases in rate base?
David Hutchens
Well, that’s a great question, because there is a combination of impacts, when we look at our capital plan. Well, every year, we lock down a capital plan, show it to our investors and then of course, they are already working on the next one. So, there will be, as we go forward, and we look at this next capital plan that we'll roll out in the fall for the next five year period, it will be a combination of things that go in there related to inflationary – we redo budgets on these all the time. Obviously, the shorter term contracts are much more known. Some of that exposure might be hedged with the contracts or commodity, et cetera. But, on a going forward basis, that goes all back into the thought with the additional fine tuning of project definitions and of course, the addition of new projects as we go. So, we – I probably don’t have a clear view on where that might go from an inflationary pressure perspective, whether that drives the capital up. Of course, there is FX impacts, as well. And then, when you look at it from a funding perspective as Jocelyn noted, we have the DRIP program that we are getting really strong participation in. So, all those pieces will go back into tell that story when we roll it out later this fall.
Elias Foscolos
Okay a noteworthy and easy question but it would one that I wanted to ask and you kind of alluded to this. So I’ll just make this the last follow-up. You probably have some internal tolerances on the capital plan. Should we really expect one about six months from now? Or if you think you are moving outside those boundaries, is there a possibility that we might get an update earlier? And I’ll leave at that.
David Hutchens
Yes, there is always the option to give an update early if something big happens, right? I mean, we wouldn’t completely redo a five year forecast, but if – let’s just say, if Lake Erie Connector which is not in our five-year capital plan, drops in and we can get that thing move in. We are going to tell you, we are going to wait until September, October whenever we are going to do our Investor Day to let that cat out of the bag. It's just more of the pieces behind it. The inflationary changes, the commodity price changes, remember a lot of the stuff that we do is infrastructure, right? So it’s copper, it’s steel, it’s all of those things and we are going to have to take a hard look at what those – how those have changed and what that does to our capital budget on a going-forward basis. But anything big, we’ll let you know. The stuff is kind of the, the details behind the scenes of rolling up a capital plan, you probably don't want us to be giving it to often updates on that.
Elias Foscolos
I appreciate. And I think I’ve got a good understanding of the boundaries and how you look at it with all these moving parts. So I’ll leave it at that. Thank you very much.
David Hutchens
You are welcome.
Operator
And your next question comes from the line of Patrick Kenny with National Bank. Please proceed with your question.
Patrick Kenny
Hey. Thanks. Good morning, everybody. Just looking at the long-term decarbonizing plant for Fortis BC, wondering if you could provide just an update on your progress to integrate RNG, hydrogen, given some of the carbon capture industry that are starting to come to the surface here? I know we still got a ways to go to 2030, but would you say things are tracking on pace with your original targets? Or has there been any variance either way?
David Hutchens
Yes. I’ll kick that to Roger for some of the details. I was just actually on a House of Commons Natural Resource subcommittee on this topic last week about. From a Canadian perspective, the opportunities for looking at the clean fuels and of course our topic was around the use of both hydrogen and renewable natural gas in our gas systems and FortisBC, which is a leader in this area has really been doing some great work that we probably don’t shout loud enough on what we are doing from, one, from an RNG perspective and the projects that we have in the queue there. And then also, the R&D and the behind the scenes things that we are looking at from a hydrogen perspective. So, I’ll turn that over to Roger to add a little bit of color there.
Roger Dall'Antonia
Thanks, David. Good morning, everyone. I appreciate the question. So on the RNG front, we’ve got good line of sight to the 15% RNG target by 2030. We now have about six petajoules of agreements that are signed and approved by the BCC. Those have to be built or the off-taker on those agreements. But they are signed and approved and we have another three pending BCC approvals. So, we have about eight petajoules ready to go with a number of projects that we have identified and are in negotiations to sign. So we feel that we’ve got a very good start on the 2030 target for RNG and continue to make good progress there.
Hydrogen is a little bit – we we're more in now what I would say is the development phase. We've got a number of projects underway. We have a joint initiative with other utilities on technical feasibility studies or hydrogen blending in BC. We have a pilot project with a large industrial site to use renewable hydrogen production to blend into the gas supply for that industrial site. And we are looking at some northern BC blue hydrogen carbon capture opportunities to decarbonizes the gas system. So quite a bit of activity in this area is that the BC government is helping to find with the industry a hydrogen study. We're also working thoroughly with our industry peers on advancing hydrogen standards and development as well. So, quite a bit of progress on that front, thanks.
Patrick Kenny
Okay. Great. Thanks for that update. And then, maybe just sticking with Western Canada, given the headlines here in Alberta and the challenges in controlling the case numbers. And I guess your peers implementing a rate freeze over the next couple of years. I am not sure if you guys are considering the same or perhaps looking at other opportunities more on the social side to help out your Alberta customers?
David Hutchens
Yes. I’ll turn that over and then actually introduce Janine Sullivan, who is the new President and CEO of Fortis Alberta. Yes, we obviously recognize with our folks on the ground there in Alberta just the tough time that the province is having on several fronts. And obviously, I was just hearing yesterday on another call that, that Alberta has, I think if this is right, that they currently have the highest per capita number of cases in North America. And so, that’s obviously a concern of ours. There is nothing more important than making sure that our employees and customers and communities are safe and that we are doing everything we possibly can to protect them and to taking all the precautions that we need to as a company to not just keep providing our service, but making sure that our employees and customers are safe and are taking those right precautions. Obviously, economic impacts from COVID from the shutdowns, there is a lot of – every one of our jurisdictions has gone through it in different time periods and to different extents. And Fortis Alberta seems to be the tip of the sphere on where that’s focused now. So, I’ll turn that over to Janine and have her explain what we may be looking at doing there for our Albertan customers.
Janine Sullivan
Thanks, Dave. And yes, we are certainly very cognizant of the challenges that are going on in Alberta right now, particularly, as COVID continues to ramp up and really pose some issues for our customers. We are really cognizant of the heightened focus on the cost of delivered electricity in the province and the conversation that our customers are having with the regulator and with government. And we’ve been a part of those conversations and we are staying close to them. There has been some proposals as to how it can be addressed and of course, we are watching how those play out and assessing those in light of our own specific circumstances and working on proposals as to how we might approach it in the coming months, particularly as we work through this approach to resetting rates for 2023 at the end of this PBR terms. So there is some opportunities coming where we – we’ll continue to work through, options available to us and see how those have been put out already play out and how they are received and how they might work to address the issues at hand.
Patrick Kenny
Okay. Thank you very much for your comments.
David Hutchens
Thanks, Patrick.
Operator
As there no further questions in queue, I would now like to turn the conference over to Ms. Amaimo for her closing remarks.
Stephanie Amaimo
Thank you, Deborah. We have nothing further at this time. Thank you everyone for participating in our first quarter 2021 results call. Please contact Investor Relations should you need anything further. Thank you for your time and have a great day.
Operator
Thank you for participating, ladies and gentlemen. This concludes today’s conference. You may disconnect your lines.