To read the complete fleet status report of March 10, 2017, click here.
1. Class: Jackups
# | Name Year Built | Spec. Feet/K feet | Contract End | Current Day rate | Location Rate at 0 revenue |
1 | Dhabi II 1982/2006 | 120/20 | mid 7/17 | 76 | [NDC ZADCO] UAE |
2 | M1161 1980 | 300/20 | Early 4/18 | 62 | [Dynamic Drilling/ONGC] Bareboat chartered India |
3 | B152 1982/2004 | 150/20 | Late 11/17 | 81 | [NDC] UAE |
4 | (L1112) Noble Ed Holt 1981/2003 | 300/20 | Late 10/18 | 38 | [Dynamic Drilling/ONGC] Bareboat chartered India |
5 | L786 1983/1998 | 300/25 | mid 3/18 | 53 | [Dynamic Drilling/ONGC] Bareboat chartered India |
6 | 6/2014 | JU 2000E HS-HE | mid 11/17 | 218 | [Total] UK NS Sold to SinoEnergy |
7 | B 391 1981-2001 | JU | Late March 17 - Late June 17 | 55 | [Centrica] UK NS 4-wells |
8 | Prospector 1 | JU 2000E HS-HE | Mid 2/18 | 113 Swap with C461 | [ONE] NL Sold to SinoEnergy |
3. Prospector Offshore HE-HS Jack-up new build.
# | Name Year built | Spec. Feet/K feet | Contract End | Information |
1 | Prospector 6 Delayed | JU 2000E HS-HE | Available | Option |
2 | Prospector 7 delayed | JU 2000E HS-HE | Available | Option |
3 | Prospector 8 delayed | JU 2000E HS-HE | Available | Option |
Note: The company has the option to delay the delivery of Prospector 6. The three rigs (P6, P7 and P8) are being constructed on a non-recourse basis with no parent company guarantees. They do not figure into the fleet status anymore.
Cold Stacked and Ready Stacked Rigs
Note: Ready stacked includes warm stacked, hot stacked and available (When the status or rig name is marked in blue you can click to get more information).
Name | Year built | Location | Last contract date | status | |
Drillships | |||||
1 | DPDS1 | 1979 | US GoM | 11/14 | Cold stacked |
2 | DPDS2 | 1981/2002 2011 | Puerto Rico | 9/15 | Cold Stacked |
3 | DPDS3 | 1977/2005 2013 | Puerto |